A reference from Canadian Manufacturers & ExportersSign in

Also called Deming cycle, Shewhart cycle, PDSA

What is Plan-Do-Check-Act?

A four-step loop for making a change: decide what you expect, try it small, measure what happened, then keep it or change it.

What else it is called

Other names
Deming cycle, Shewhart cycle, PDSA
In French
roue de Deming

Related entries

Last reviewed October 16, 2026. Published by Canadian Manufacturers & Exporters.

Cite this entry

“Plan-Do-Check-Act.” Manufacturopedia, Canadian Manufacturers & Exporters. https://digital-excellence-platform.vercel.app/resources/manufacturopedia/pdca

Free to quote with attribution and a link to this entry.

This term on Wikidata

Understanding Plan-Do-Check-Act

Plan: state the problem, decide the change, and write down what you expect to happen and how you will measure it. Do: try it on a small scale. Check: compare what happened against what you predicted. Act: adopt it, adjust it, or abandon it, and start again.

Almost every plant does plan and do. Far fewer do check, because by then the team has moved on and the change feels settled. Skipping it means you accumulate changes nobody has verified, and when results drift two years later nobody can say which of them to undo.

The discipline that makes the loop work is writing the predicted result down in advance. Judged afterwards, almost any outcome can be made to look like a success.

In practice

Before the change: "this should take the changeover from 38 minutes to under 20 within four weeks." That sentence is what makes the check step possible.

Frequently asked

What is the difference between PDCA and DMAIC?

They are the same idea at different weights. PDCA is a light loop for everyday improvement. DMAIC, from Six Sigma, adds formal measurement and statistical analysis and suits problems where the cause is genuinely unknown and the data is noisy.