What is a routing?

The ordered list of operations a part goes through, with the work centre and the time allowed for each.

What else it is called

Other names
routings, process routing, operation sequence, work instructions
In French
gamme de fabrication

Related entries

Last reviewed October 15, 2026. Published by Canadian Manufacturers & Exporters.

Cite this entry

“Routing.” Manufacturopedia, Canadian Manufacturers & Exporters. https://digital-excellence-platform.vercel.app/resources/manufacturopedia/routing

Free to quote with attribution and a link to this entry.

Understanding routing

The sequence of operations a part passes through, naming the work centre for each, the setup time it needs and the run time per piece. It is the operational half of the product definition, the bill of materials being the other.

It also carries more weight than it looks. Capacity planning multiplies routing times by scheduled quantities. Quoting adds routing times to material cost. Standard costing values work in process by the operations completed. Every one of those inherits whatever is in the routing, so stale times propagate into quotes, promises and reported margins simultaneously.

The maintenance problem is real. Routings get written when a part is introduced, improved on the floor over the following year, and never updated - so the quote reflects a process that has been superseded. When quoted hours and actual hours diverge persistently, the routing is the first place to look, and it is almost never the floor’s fault.

In practice

When quoted hours and actual hours diverge, the routing is usually the culprit rather than the floor.

Frequently asked

How often should routings be reviewed?

Annually for active parts, and immediately after any process change or tooling change. A cheaper trigger is variance: review any routing where actual hours differ from standard by more than about 15 per cent over a reasonable number of jobs.

Should routing times be the best case or the realistic case?

Realistic, including the setup and the normal interruptions, because the number is used for promising dates as well as for costing. Optimistic routings produce quotes you win and lead times you miss.